翻訳と辞書
Words near each other
・ Maritimum
・ Maritimus
・ Maritino Nemani
・ Marito
・ Marito e moglie
・ Marito y el temible Puf vuelven a ganar otra vez
・ Maritoni Fernandez
・ Maritrema
・ Maritrema heardi
・ Maritrema prosthometra
・ Maritrema subdolum
・ Maritsa
・ Maritsa (disambiguation)
・ Maritsa 3 Power Plant
・ Maritsa Hotel
Maritsa Iztok Complex
・ Maritsa motorway
・ Maritsa Municipality
・ Maritsa Peak
・ Maritsa, Rhodes
・ Maritsauá language
・ Maritta Bauerschmidt
・ Maritta Becker
・ Maritta Wolff
・ Marittima
・ Marituba
・ Marituba River
・ Maritz
・ Maritz Rebellion
・ Maritz, Inc. v. Cybergold, Inc.


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Maritsa Iztok Complex : ウィキペディア英語版
Maritsa Iztok Complex

The Maritsa Iztok Complex is the largest energy complex in South Eastern Europe. It is located in Stara Zagora Province, south-central Bulgaria. It consists of three lignite-fired thermal power stations. The complex is located in a large lignite coal basin, which includes several mines, enrichment plants, a briquette plant and its own railway system. The development of the thermal power and mining complex at Maritsa Iztok began in 1952, but the lignite deposits used to be known well in the mid-19th century. The Maritsa Iztok mines and power plants are interdependent as the only market for coal is the power plants, while the power plants have no other supplier of coal but the mines.〔

== Maritsa Iztok-1 (TPS AES Galabovo)==
Maritsa Iztok-1 is located near Galabovo. In October 1998, the old power plant with a capacity of 500 megawatts (MW) was privatized and sold to Consolidated Continental Commerce (3C), later purchased by AES Corporation. On 15 February 2000, AES and the Bulgarian grid operator Natzionalna Elektricheska Kompania EAD (NEK) signed a 15-year tolling agreement, according to which AES has an obligation to replace the old power station with a new facility.〔
}〕 In June 2006, AES started construction of the new 670 MW power station.〔 It became operational on 3 June 2011.〔
〕 The new power station consists of two pulverised coal boilers of 335 MW each, two steam turbines, two generators and desulphurisation facilities.〔 The plant was constructed by Alstom.〔 It cost €1.2 billion.〔 It is the first large-scale power plant built in Bulgaria in the last 20 years, and the single largest foreign investment in Bulgaria and one of the largest green field investments in South East Europe.〔
〕〔


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)